REQUIREMENTS, CONNECTED

Know what to build.
See why it matters.

Turn engineering requirements into a clear path from stakeholder need to verification. Bring your spreadsheets, connect the decisions, and review the work together.

Start by exploring the Atlas Platform example, then choose “Start an empty project” to build your own. No account needed to explore.

ENGINEERING EXAMPLE Thermal control
SHN-001 · Stakeholder needThe user needs to recognise an overheating unit before damage occurs.
Derives from
SYRQ-001 · System requirement In reviewThe system shall raise an alarm within 1 second when temperature exceeds 80°C.
Verify over-temperature alarm responseLinked verification · Measurable acceptance criteria

Welcome to NodeLynx

Opening your workspace…

Free & Team pricing
FROM SPREADSHEET TO SHARED SPECIFICATION

A clearer review before the next engineering milestone.

Your team is preparing a design review. Requirements sit in a spreadsheet, supporting files are scattered, and a change has consequences beyond a single row. NodeLynx brings that context into one project.

  1. 01
    Bring the requirements

    Import CSV or Excel, map the columns, and organise requirements into folders.

  2. 02
    Make the reasoning visible

    Connect stakeholder needs, system requirements, supporting documents and verification.

  3. 03
    Review what changed

    Discuss requirements, capture a baseline, and compare the project as it evolves.

TRY IT ON A REAL PROJECT

Bring one project.
Find a better way to work together.

Discuss your requirements workflow and what a useful team pilot would look like.

Book a pilot hello@inovalynx.comOpens your email app with a short pilot enquiry.
NODELYNX IN TWO MINUTES

From a need to a release baseline.

Illustrative engineering example · Thermal control

01

Start with the need

Give the team a shared reason to build. Capture the stakeholder’s need, then make it measurable in a system requirement.

SHN-001 · Stakeholder needThe user needs to recognise an overheating unit before damage occurs.SYRQ-001 · System requirementThe system shall raise an alarm within 1 second when temperature exceeds 80°C.